
Built on Trust.
Exceeding Expectations.




Overview | Industrial & Warehouse
Executive Flooring & Construction Solutions has completed over 4.6 million sq ft of industrial and warehouse projects across 15+ states, serving national clients like UPS, FedEx, Lowe’s, and Ryder. Our work spans both remodels and new construction, with expertise in Division 3, 9, 10, and 12 finishes. From logistics hubs to maintenance facilities, we deliver precision, phasing flexibility, and consistent quality on time, within budget, and built to last.
2023 - 2024
Warehouse
Locations: 11 States - AZ, TX, AR, FL, OK, IL, MO, NY, NJ, TN, MS
Sq Ft: 4.3M
Scope of Work:
-
Division 9: ceramic, resilient, epoxy, framing, ACT ceilings, gypsum
-
Division 3: polished & stained concrete
-
Division 10: partitions, accessories
-
Division 12: millwork
Type: Remodels & new construction

2023 - 2024
Warehouse

2025
Warehouse
Location: Jonesboro, AR
Sq Ft: 40,000
Scope of Work:
-
New construction
-
Division 3 & 9 flooring
-
Polished concrete, epoxy, resilient surfaces


2025
Warehouse
2025
Warehouse
Location: Mt. Pleasant, TX
Sq Ft: 80,000
Scope of Work:
-
Remodel
-
Division 3: stained/polished concrete
-
Division 9: resilient & ceramic finishes


2022 - 2024
Warehouse
2024
Maintenance
Facilities
Locations: TX, MD, IN, SC, TN, KY, GA
Sq Ft: 210,000
Scope of Work:
-
Remodel
-
Division 9: floors, ceilings, framing
-
Division 10: bathroom partitions/accessories
-
Division 12: millwork


2022 - 2024
Maintenance
Facilities
Industrial Projects | National Reach, Critical Delivery
The Challenge
Major logistics and retail clients—including UPS, FedEx, Lowe’s, and Ryder required interior upgrades and new construction across critical facilities nationwide. Each project demanded tight timelines, active jobsite coordination, and consistent finish quality. The challenge was scaling across multiple states while adapting to varied schedules, access limitations, and operational protocols all without disrupting mission-critical warehouse and distribution operations.
What We Did
From 2022 to 2025, EFS delivered over 4.6 million sq ft of industrial work across 15+ states. Our teams handled both remodels and ground-up builds, executing full Division 3, 9, 10, and 12 scopes, including polished/stained concrete, epoxy systems, resilient flooring, ACT ceilings, framing, millwork, and bathroom partitions. Projects were phased around facility operations, with teams scheduled to minimize downtime and align with regional construction demands. All work met the safety, quality, and logistical standards required by national-level clients.
EFS Results
EFS successfully completed warehouse and maintenance facility scopes for all four clients on time and within budget, while maintaining consistent quality across every jobsite. This program demonstrated our ability to manage multi-client, multi-location rollouts while adapting to fast-paced industrial environments. Our performance helped modernize logistics infrastructure at scale and positioned EFS as a trusted national partner in the warehouse, retail, and transportation sectors.